Multiple Drawings and Reports
TubePro 4.0 allows you to add multiple drawings and reports to a project. The legend for each drawing is unique which allows you to control what defects are displayed on each drawing.

You create a new drawing page by selecting 'Add Drawing Page' from the 'Drawing' menu.

 
From the 'Add Drawing Page' window you can specify a name for the new drawing and also how you want the drawing to be created.

  1. 'Create a copy of the current page'  will create a copy of the drawing page that is currently active in the project. This copy will include any tube drawing sections that is on that page.
  2. 'Create a black copy of the current page' will copy the drawing page that is currently active in the project but will not include any drawing sections. You can add the tube drawing sections you want to include later.
  3. 'Load a drawing template from file' creates a drawing based on the template that you specify and does not include any tube drawing sections. You can add the tube drawing sections you want to include later.

A tube inspection report will automatically be create for the tube section that are included on each drawing.

The Project Browsers 'Drawings & Reports' tab lets you switch between drawings and reports by double clicking on the items in the list.